deposit 5000
slot deposit 5000
slot gacor situs toto
togel online
toto 4d
situs slot toto 4ddemo slot gacorslot 88
slot gacor slot gacor
slot gacor
brenjitu
slot gacor
situs toto
situs toto
SITUS TOTO
situs toto
TOTO 4D
SITUS TOTO 4D
SLOT GACOR
https://booking.embuni.ac.ke/live-draw-sydney-hongkong
TOTO 4D
toto togel
slot online
slot gacor
slot gacor
slot pulsa
hongkong lotto
slot gacor
brenjitu
slot pragmatic
situs bola
situs gacor
situs toto
situs slot gacor
slot 4d

Nine plants generate 71% electricity in Nigeria – Report

Marcus Amudipe
Marcus Amudipe

It has been discovered that only nine of the 26 power plants connected to the national grid produce 71% of the country’s electrical needs.

According to The PUNCH, the plants include Egbin, Kainji, Azura-Edo IPP, Jebba, Delta, Shiroro, Odukpani, Afam VI, and Geregu, each of which has a minimum 5.76 per cent equity.

Statistics collected from the Nigerian Electricity Regulatory Commission, NERC, on the most recent report, ‘State of the Sector NERC Annual Report 2020,’ suggested that the industry may be at risk due to the grid’s over-reliance on the energy supplied by nine of the 26 power plants.

This was because downtime in any of them might result in grid instability if there was no adequate reserved capacity from other plants to timely offset adverse impact of any sudden loss of generation from any of the 9 plants, NERC said.

According to the report, the nine power plants accounted for 71.80 per cent of the total electric energy generated in 2020.

Due to its size and availability, Egbin power plant accounted for the highest share,13.54 per cent of the total energy output, followed by Kainji hydropower plant which accounted for 8.31 per cent energy share. Azura Edo, Jebba, Shiroro and Delta were also among the top-six contributors to generate output during 2020.

During the same period, Gbarain power plant accounted for the least share of output contributing 0.24 per cent.

Compared to 2019, the reliance on the aforementioned nine power plants increased by 4.54 percentage points as they only accounted for 67.26 per cent of total generation in 2019.

The NERC said it had commenced the process of gradually activating the industry contracts to provide certainty to the minimum volume of energy expected of each generating plant and properly allocate risks among the industry operators.

This, the Commission said, was expected to lead to incremental growth in power availability and utilisation.

During the year 2020, the available generation capacity of the 26 active plants stood at 6,107MW while the average generation was 4,054MWh, about 5.97 per cent higher than the generation level in 2019.

The industry recorded the highest daily peak generation of 5,520MWh on 30th October 2020.

Nigeria currently generates just a little over 4000MW despite promise to hit at least 5000MW from July 1..

Experts say the country needs at least 30, 000MW to reach sufficiency.

The NERC said complete resolutions of the technical and operational challenges in the Nigerian Electricity Supply Industry, NESI, remained a top priority.

“We are currently working to ensure that the Payment Assurance Facility for ensuring that GenCos honour their obligation to gas suppliers comes to an end. The Commission is finalising an Escrow Arrangement for the industry that will provide payment security for GenCos and gas suppliers pending full activation of contract obligations,” it said.

The average load factor across all plants stood at 61.74 per cent in 2020, indicating that an average power plant operating in the year 2020 had 61.74 per cent of its available capacity dispatched by the System Operator, SO. This represents a slight increase of 1.06 percentage points from the 60.68 per cent recorded in 2019.

Kanji, Jebba and Shiroro hydro plants, respectively, had 83.60 per cent, 78.73 per cent and 67.59 per cent of their available capacities dispatched by the SO and were respectively first, third and eight plants with the highest dispatch rates.

Thus, NERC said the dispatch rates of the three hydro plants complied with its Order NERC/182/2019, declaring hydropower plants as “must-run” by SO.

The Order was to ensure that hydro plants were efficiently dispatched, given their low tariffs and in consideration of safety associated with spilling water from dams during the rainy season.

In 2020, the Azura power plant had a load factor of 79.74 per cent while Sapele NIPP had the least dispatch rate of 33.71 per cent.

A previous report by The PUNCH in July chronicled the drop in the combined generation capacity of the country’s 26 power plants by 70 per cent.

Data revealed that the capacity of the plants dropped from a total of 13, 461MW to 4,022MW as of when they were last tested in July 2021.

A spokesperson for the GenCos, Joy Ogaji, declined comments on the perennial low power generation by the firms.


Share this Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

situs totoslot thailand situs totoslot gacor situs toto slot online situs toto demo slot gacor situs slot gacorsitus 4d situs totoslot gacorslot gacorslot gacorslot gacorslot gacor
slot gacor
slot gacor situs toto
togel online
toto 4d
situs slot slot demo pgslot 88
slot gacor slot gacor
slot gacor
brenjitu
situs toto
situs toto
SITUS TOTO
toto macau 4d
TOTO 4D
SITUS TOTO 4D
SLOT GACOR
https://booking.embuni.ac.ke/live-draw-sydney-hongkong
TOTO 4D
toto togel
slot online
slot gacor
slot pulsa
hongkong lotto
slot gacor
slot gacor
slot pragmatic
situs bola
situs gacor
situs toto
situs slot gacor
situs totoslot gacordemo slot situs slot gacor
slot66
slot gacor
situs slot gacor
slot gacor
scatter hitam
scatter hitam
slot gacor scatter hitam
scatter hitam
situs slot gacor pulsa
situs baru slot gacor