deposit 5000
slot deposit 5000
slot gacor situs toto
togel online
toto 4d
situs slot toto 4ddemo slot gacorslot 88
slot gacor slot gacor
slot gacor
brenjitu
slot gacor
situs toto
situs toto
SITUS TOTO
situs toto
TOTO 4D
SITUS TOTO 4D
SLOT GACOR
https://booking.embuni.ac.ke/live-draw-sydney-hongkong
TOTO 4D
toto togel
slot online
slot gacor
slot gacor
slot pulsa
hongkong lotto
slot gacor
brenjitu
slot pragmatic
situs bola
situs gacor
situs toto
situs slot gacor
slot 4d

MTN re-examines tower contracts over fuel, foreign exchange expense

Bisola David
Bisola David

MTN Nigeria is currently renegotiating periodic reviews of the company’s tower contracts.

The Punch reported that the company pointed out that these contract renegotiations are critical to lessening the effects of increasing energy prices and FX liberalization.

The company made this announcement in light of the recent tower contracts it awarded to ATC and the upcoming renewal of 1,500 more site contracts.

The CEO of MTN Nigeria, Karl Toriola, shared this insight during the organization’s most recent Capital Markets Day.

“We will periodically review the contracts we have with our partners to ensure they optimally meet our site requirements,” he said. “Efficient tower contracts are key in driving cost-effective, deep broadband penetration and leading technology across our operations.”

“But in addition to efficiency, we’ll also be concentrating on cost optimization, using green energy, and sustainability.”

The Chief Financial Officer of MTNN, Modupe Kadri, provided an overview of the company’s tower operations in his presentation.

He said, “IHS currently has 14.6k sites (80%) compared to ATC’s 2.3k sites (13%). ATC was granted around 2.5k network sites under the IHS portfolio, which are scheduled to expire in 2024 and 2025, following an intensely competitive bidding process.

“As a result, ATC will represent 26% of the total portfolio, increasing to 4.7k sites from IHS’s 66% portfolio of 12.1k sites. Most of the remaining IHS sites will close in 2029, with the remainder expiring between 2025 and 2029.

“Renegotiating tower contracts and maintaining a disciplined capital allocation plan is critical to reducing the effects of currency liberalization and rising energy prices.”

The company went on to say that it is thrilled about the possibility of a liberal economic reform plan for Nigeria, which offers a chance to unlock the country’s potential for prosperity.


TAGGED:
Share this Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

situs totoslot thailand situs totoslot gacor situs toto slot online situs toto demo slot gacor situs slot gacorsitus 4d situs totoslot gacorslot gacorslot gacorslot gacorslot gacor
slot gacor
slot gacor situs toto
togel online
toto 4d
situs slot slot demo pgslot 88
slot gacor slot gacor
slot gacor
brenjitu
situs toto
situs toto
SITUS TOTO
toto macau 4d
TOTO 4D
SITUS TOTO 4D
SLOT GACOR
https://booking.embuni.ac.ke/live-draw-sydney-hongkong
TOTO 4D
toto togel
slot online
slot gacor
slot pulsa
hongkong lotto
slot gacor
slot gacor
slot pragmatic
situs bola
situs gacor
situs toto
situs slot gacor
situs totoslot gacordemo slot situs slot gacor
slot66
slot gacor
situs slot gacor
slot gacor
scatter hitam
scatter hitam
slot gacor scatter hitam
scatter hitam
situs slot gacor pulsa
situs baru slot gacor