deposit 5000
slot deposit 5000
slot gacor situs toto
togel online
toto 4d
situs slot toto 4ddemo slot gacorslot 88
slot gacor slot gacor
slot gacor
brenjitu
slot gacor
situs toto
situs toto
SITUS TOTO
situs toto
TOTO 4D
SITUS TOTO 4D
SLOT GACOR
https://booking.embuni.ac.ke/live-draw-sydney-hongkong
TOTO 4D
toto togel
slot online
slot gacor
slot gacor
slot pulsa
hongkong lotto
slot gacor
brenjitu
slot pragmatic
situs bola
situs gacor
situs toto
situs slot gacor
slot 4d

Expect zero downtime, Eko Disco tells customers

Bisola David
Bisola David

A leading and customer-focused power utility firm, Eko Electricity Distribution firm has stated that it has added systems in place to ensure prompt response to consumer complaints and power outages.

The Punch reported that the company claimed in a statement that these are intended to enhance the caliber of service provided to its respected clients.

The statement read: “EKEDC’s proactive approach is focused on reducing downtime by utilizing cutting-edge technology and innovative processes, thereby reducing the duration in which electricity supply is disrupted or unavailable.”

It stated that the business had made investments in a variety of electrical equipment and technology to guarantee no or little downtime and had established the Rapid Response Squad to respond to outage and problem reports more quickly.

The squad was reportedly established by the Managing Director and Chief Executive Officer, Dr. Tinuade Sanda, as a unit under the Technical Operations department in April 2022.

Its main responsibility is to supervise and ensure that breakdown maintenance and faults are tracked and resolved within the permitted Turnaround Time as set by the Nigerian Electricity Regulatory Commission.

According to the NERC Order, the Head of RRS, Nasir Gbadegesin, said “EKEDC’s aim for fault clearance and resolution for 33 kV and 11 kV is ten and six hours, respectively.

“The Power System Control, the District Operators, the Protection and Testing divisions, and the RRS work together to rapidly and effectively resolve faults without jeopardizing safety.”

He stated that the team responds to any failures on the 33 kV feeder at the injection sub-stations and, if necessary, aids the Breakdown Maintenance team at the various districts in resolving the issues.

Agbara, Apapa, Ajah, Ijora, Ibeju, Festac, Lekki Mushin, Orile, Ojo, and Islands are the 11 districts that makeup EKEDC’s service area.

“With the help of advanced monitoring systems and predictive maintenance techniques, which are used to continuously check the performance of the grid. They are capable of real-time anomaly, fluctuation, or failure detection,” Gbadegesin said.


TAGGED:
Share this Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

situs totoslot thailand situs totoslot gacor situs toto slot online situs toto demo slot gacor situs slot gacorsitus 4d situs totoslot gacorslot gacorslot gacorslot gacorslot gacor
slot gacor
slot gacor situs toto
togel online
toto 4d
situs slot slot demo pgslot 88
slot gacor slot gacor
slot gacor
brenjitu
situs toto
situs toto
SITUS TOTO
toto macau 4d
TOTO 4D
SITUS TOTO 4D
SLOT GACOR
https://booking.embuni.ac.ke/live-draw-sydney-hongkong
TOTO 4D
toto togel
slot online
slot gacor
slot pulsa
hongkong lotto
slot gacor
slot gacor
slot pragmatic
situs bola
situs gacor
situs toto
situs slot gacor
situs totoslot gacordemo slot situs slot gacor
slot66
slot gacor
situs slot gacor
slot gacor
scatter hitam
scatter hitam
slot gacor scatter hitam
scatter hitam
situs slot gacor pulsa
situs baru slot gacor