deposit 5000
slot deposit 5000
slot gacor situs toto
togel online
toto 4d
situs slot toto 4ddemo slot gacorslot 88
slot gacor slot gacor
slot gacor
brenjitu
slot gacor
situs toto
situs toto
SITUS TOTO
situs toto
TOTO 4D
SITUS TOTO 4D
SLOT GACOR
https://booking.embuni.ac.ke/live-draw-sydney-hongkong
TOTO 4D
toto togel
slot online
slot gacor
slot gacor
slot pulsa
hongkong lotto
slot gacor
brenjitu
slot pragmatic
situs bola
situs gacor
situs toto
situs slot gacor
slot 4d

TCN to restore North-East electricity May 27

Onwubuke Melvin
Onwubuke Melvin

The Transmission Company of Nigeria has informed the governors of the North-East states that efforts are currently being made to restore electricity in the region before May 27, 2024.

TCN reported on Tuesday, in a circular signed by the Commission’s spokesperson, Ndidi Mbah, that its team was actively rebuilding the four towers that were destroyed by vandals in the region, and asked for a little patience as the work progresses., according to Nairametrics.

Mbah also pointed out that the commission has required contractors to install on-site machines to speed up the production process of tower components, which is currently in progress.

“The Transmission Company of Nigeria wishes to assure the North East Governors Forum (NEGF) that we are doing everything possible in our power to ensure the restoration of power supply to the North Eastern axis of the country, as earlier indicated in our press release of 10th May 2024.

“Our team has been tirelessly working to rebuild the four towers destroyed by vandals, and we will not rest until power is restored to all the affected areas. We appeal for a little more patience, as work is truly advancing.

“To expedite the work, we have insisted that the contractor put in place on-site machines that will help increase the fabrication processes of tower members which is ongoing.

“We expect power supply to be restored by May 27, 2024, through the new 330kV transmission line, allowing Yola and Jos DisCos to offtake and distribute optimally from TCN substations,” the circular read in part.

At the beginning of April, the TCN reported that four of its towers on the 330 kV transmission line between Jos and Gombe had been damaged.

According to Mbah,  the transmission line was initially knocked out, and despite the efforts of the company’s operators to restore it, it happened again.

She explained that has resulted in the deployment of TCN operators to investigate and correct the fault.

In addition, She said the TCN engineers discovered that towers 288, 289, 290, and 291 had been vandalised and some parts had been removed while they were investigating the fault.


TAGGED:
Share this Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

situs totoslot thailand situs totoslot gacor situs toto slot online situs toto demo slot gacor situs slot gacorsitus 4d situs totoslot gacorslot gacorslot gacorslot gacorslot gacor
slot gacor
slot gacor situs toto
togel online
toto 4d
situs slot slot demo pgslot 88
slot gacor slot gacor
slot gacor
brenjitu
situs toto
situs toto
SITUS TOTO
toto macau 4d
TOTO 4D
SITUS TOTO 4D
SLOT GACOR
https://booking.embuni.ac.ke/live-draw-sydney-hongkong
TOTO 4D
toto togel
slot online
slot gacor
slot pulsa
hongkong lotto
slot gacor
slot gacor
slot pragmatic
situs bola
situs gacor
situs toto
situs slot gacor
situs totoslot gacordemo slot situs slot gacor
slot66
slot gacor
situs slot gacor
slot gacor
scatter hitam
scatter hitam
slot gacor scatter hitam
scatter hitam
situs slot gacor pulsa
situs baru slot gacor